
Risk assessment
A risk assessment should take into account all the major risks at the event, including checking that:
• all of the generators that being used are confined or fenced off so that no member of the public has access to them
• no access point is blocked to make sure emergency services can still gain access
• all electrical cables are secured and are not a trip hazard
• the area is not liable to flooding and free from any potential obstructions


